5% discount on your first quote request
Home How we work Rates About us Projects Contact Request a free quote
This is the English homepage. Other pages are currently available in Dutch.
Home  /  Wet system  /  Stapling
Fast & flexible

Stapled underfloor heating

With the tacker system we fix the underfloor heating pipe directly onto the insulation with tacker clips, following a pre-marked layout. The sand-cement or anhydrite screed is then poured over it. It is the fastest and most flexible way to install underfloor heating in a new build, an extension or any room that is getting a new screed.

Tacker tool with U-clips for stapling underfloor heating pipeOur tacker toolWith the tacker tool we staple the pipe to the insulation with U-clips while standing — fast, neat and back-friendly.
Request a free quote →
Stapled underfloor heating (tacker system) — Vloerverwarming Arnhem
Benefits

Why choose stapling?

  • Quick to install — no mesh or panels needed — the pipe goes straight onto the insulation, even large areas in a single day.
  • Free layout — any pipe spacing is possible; 100 mm centre-to-centre as standard for primary heating.
  • Low build-up — the pipe lies flat on the insulation, so the screed can stay as thin as possible.
  • Ideal for new builds — homes, extensions and industrial halls — we install throughout the Netherlands.
Good to know

The tacker system needs a sufficiently thick insulation layer (e.g. EPS or PIR with tacker foil) to staple the clips into; we check this beforehand. We use 16 mm pipe as standard, fit the manifold and pressure-test the system before the screed is poured. Pouring the screed itself is arranged by you or your contractor; we align our planning with that.

How it works in practice

The tacker system, step by step

From stapled pipe to connected manifold: this is what a tacker job looks like — here in a commercial building and a new-build home.

1 · Stapled1 · Stapled — Commercial building: pipe stapled onto the insulation, circuit by circuit to the layout plan.
Commercial building: pipe stapled onto the insulation, circuit by circuit to the layout plan.
2 · To the manifold2 · To the manifold — All circuits run bundled to the manifold on the wall.
All circuits run bundled to the manifold on the wall.
3 · Manifold connected3 · Manifold connected — Twelve circuits connected to the manifold, with sleeving at the risers — ready for the screed.
Twelve circuits connected to the manifold, with sleeving at the risers — ready for the screed.
Other systems

Also possible

Existing floor and no new screed? Then milling in underfloor heating is the smartest solution: no loss of height and no drying time.

Ready for a warm floor?

Request a no-obligation quote — reply within 2 hours.

Request a free quote →
Request a free quote →